«Healthy children are the future of the planet»

Upgrading and Equipping of School Stadium

Humanitarian project

State educational institution “Minsk Gymnasia No. 2”

 

1. Name of the project: “Healthy children are the future of the planet.” Construction of a modern full-scale sports ground at the school stadium.
2. Project implementation period: 2021-2023
3. The applicant organization proposing the project: State educational institution “Minsk Gymnasia No. 2”
4. Legal address: 220141, Minsk, 37 Nikiforova Str.

Postal address: 220141, Minsk, 37 Nikiforova Str.

5. Phone, fax, e-mail: 8 (017) 348 55 86, gymn2@minsk.edu.by
6. Head: school principal Lilia M. Min’ko. 8 (017) 348 55 86, gymn2@minsk.edu.by
7. Objectives of the project: creating conditions for physical exercises, sports, maintaining health, instilling healthy lifestyle skills among students of different age and health groups through the upgrading and equipping of the inclusive school stadium. Creating conditions for physical culture and healthy lifestyle of residents of the Uruchye district when organizing leisure activities.
8. Tasks to be implemented within the framework of the project:

– Change the infrastructure of the gymnasia sports and recreational environment.

– Create favourable conditions for physical education, sports, leisure and recreation for students.

– Contribute to the formation of a sustainable interest in regular working out and sports.

– Promote active types of physical culture and sports activities and a healthy lifestyle.

– Contribute to the socialization of students through the organization of sports events and competitions.

– Promote various sports (football, basketball, volleyball, tennis, hockey, etc.) that take into account the interests of children during the school year and holidays.

– Equipping and improving the sports base in accordance with modern safety and comfort requirements.

– Promote inclusive education from the earliest age of students and children of the district through physical education and sports.

– To promote physical culture and healthy lifestyle of residents of the microdistrict when organizing leisure activities.

9. Target group: children and adolescents aged 6 to 18, students of the gymnasia and adjacent residential buildings.
10. Brief description of project activities:

1. Development of design estimates for the upgrading and equipping of school stadium.

2. Carrying out work on changing the infrastructure of the gymnasia sports and recreation environment:

arranging a multifunctional fenced area with a synthetic surface for volleyball, basketball, mini-football, athletics, equipping the school stadium with sports equipment, outdoor exercise equipment, arranging a synthetic covering for an athletics treadmill, manufacturing and installation of a gymnasia, installation of a hockey rink with a synthetic surface of the area. Installation of a ground for workout and gorodki sports.

3. Inauguration of the stadium, holding a sports festival “Gymnasium – a territory for sports.”

 

11. Plans:

 

Construction works May-2021 Plans
Reconstruction and modernization of the gymnastics campus in accordance with modern equipment requirements, arrangement of a playground for outdoor sports simulators    
Replacement of the sandy surface of the track and field running track with synthetic    
Reconstruction of basketball, volleyball courts,

mini-football field

   
 

(the photos in the right column of the table are taken from the Internet)

 

12. Our achievements:

Students of the state educational institution “Minsk Gymnasia No. 2” took the third place (out of 14) in the 75th Sports days of the students of the Pervomaisky district of Minsk in the 2020/2021 academic year) in the category of educational institutions of over 400 students. Of particular note is the 1st place in the “Schooliad”, 1st place among boys, 2nd place among girls in athletics competitions, 1st place among girls in table tennis competitions, 3rd place in “Snow Sniper” competitions.

13. Estimated cost of the project: 210 000 BYN /85 000 USD/ 71 000 EURO

Donor funds: 190 000 BYN /77 000 USD/ 64 000 EURO

Co-financing: 20 000 BYN /8 000 USD/ 7 000 EURO

14. Estimated cost of work and equipment:

Construction works Estimated cost (BYN)
Dismantling of existing sports structures and structures, garbage collection 5000
Leveling the surface 5000
Modernization of the gymnastics campus, purchase and installation of outdoor sports simulators 80000
Replacement of the sandy coating of the track and field running track with synthetic, marking 10000
Reconstruction of the volleyball court 30000
Reconstruction of the basketball court 30000
Reconstruction of the mini-football field 50000
15. Project implementation location: Minsk, 37 Nikiforova Str.
16. Contact person:

Yulia Tolkach,

Deputy Director for Academic Affairs of the

State educational institution “Minsk Gymnasia No. 2”, +375295034691, tolkach@minsk.edu.by

2927